Gas heats most homes here
56.7% of occupied homes in Ward County heat with utility gas. Another 6.7% use bottled or LP gas. A heat pump going into one of these homes is usually paired with that existing furnace rather than replacing it outright.
Takes about a minute. No obligation.
56.7% of occupied homes in Ward County heat with utility gas. Another 6.7% use bottled or LP gas. A heat pump going into one of these homes is usually paired with that existing furnace rather than replacing it outright.
A dual fuel setup lets the heat pump handle the milder days and the gas furnace take over when it gets cold enough that the heat pump stops being the better option. Sizing the heat pump right, and setting the switchover point, depends on the furnace already in the house.

NOAA nClimDiv, 1991–2020 normals
North Dakota homes paid 11.51 cents per kilowatthour for electricity in 2024.
A standard heat pump sized to the house is enough here. There's no local reason to pay for a bigger or higher-efficiency unit.



Heat pumps here run nine months out of the year, from September through May, with the gas furnace carrying some of that load on the coldest days. August is the month to get one installed. Wait until the first cold snap and you're one of many homeowners in Minot calling around at once, and the furnace alone is left to handle the house until the install can happen. Putting it in before September means the dual fuel setup is tested and the switchover point is set before it has to work. It also means the contractor has time to size the heat pump against the furnace that's already there, instead of rushing a match in the cold.
A standard size and efficiency fit fine here. There's no local reason to go bigger or pricier.
Find a contractorA heat pump that's too big cycles on, hits the room, and shuts off again before it ever ramps up to a steady speed. One that's too small runs flat out and still falls behind when the temperature drops, leaning on backup heat more than it should. A contractor works out the size from a load calculation. That means the heat loss and gain of the house itself, not a rule of thumb based on whatever the old equipment was rated for. Where there's already a furnace in the house, that pairing matters too. The heat pump has to be sized to carry the house through the milder stretches on its own, then hand off to the furnace at a switchover point set for that pairing. Get the sizing wrong and the signs show up slow. Longer run times. A system that never quite catches up. A furnace doing more of the work than it was meant to.
Pairing a heat pump with an existing furnace means adding a control board or a thermostat that can read outdoor temperature and decide which system runs. That switchover logic has to be set up and tested, not just wired in. It's part of the install, not an extra on top of it.
Where the outdoor unit sits, how far the refrigerant lines have to run, and whether the existing ductwork can handle the airflow all shape the job. A straightforward line run with ducts already sized right costs less labor than one where the contractor has to work around tight clearances or modify ductwork to make the air move.
When you're comparing bids, ask what the load calculation was based on, not just what size they landed on. Contractors can walk through the same house and come up with different numbers if one is measuring heat loss and gain and the other is just matching the old furnace's rating. Ask how the switchover point gets set between the heat pump and the furnace, and whether that gets tested after install or just programmed and left alone. Ask what happens to the existing ductwork, whether it needs modification to handle the heat pump's airflow or whether it's already sized right. Ask where the outdoor unit will sit and how far the line set has to run, because that changes the labor even when the equipment itself is identical. A contractor who answers these with specifics about your house is doing something different from one who answers with a brand name and a size.
Install day starts with the load calculation already done and the equipment already matched, so what happens on site is mostly positioning and connecting. The outdoor unit goes in first, set on a pad or bracket with clearance on all sides so air can move through the coil. Refrigerant lines run between the outdoor unit and the indoor coil, then get pressure tested before anything is charged. A leak found after the charge means undoing work that was already called finished. The indoor coil ties into the existing ductwork, and if that ductwork wasn't sized for the airflow a heat pump moves, this is where it gets adjusted. Electrical work follows. A dedicated circuit, a disconnect box outside near the unit, and the control wiring that lets the thermostat talk to both the heat pump and the furnace. Last comes the part that's easy to skip and shouldn't be, running the system through its paces, checking that it reaches full capacity, and setting the point where it hands off to the furnace instead of just leaving that programmed and untested.
