A dark-clad two-story house with a metal gable roof stands in front of tall evergreen trees, viewed low across a mown green lawn.

Heat Pump Installation in Garrison, ND

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpMcLean County, ND
Step 1 of 2

What ZIP code is the job in?

Gas is the most common fuel here

Utility gas heats 42.5% of occupied homes in McLean County. Another 27% run on bottled or LP gas, so most houses here already have a furnace handling the cold months.

A heat pump changes that setup

Installing one means putting in equipment that heats and cools from the same unit, rather than matching what's already there. Whoever installs it will need to size it for this house and work out how it pairs with any existing furnace or ductwork.

9 months
September through May, your system heats
2 months
July through August, it cools
5°F
the average winter night it heats against
79°F
the average summer afternoon it cools against
Isometric cutaway illustration of a single-story house showing an indoor air handler, branching ductwork through rooms with furniture, and an outdoor condenser unit connected by a line outside the wall.
Your system heats September through May and cools July through August.

NOAA nClimDiv, 1991–2020 normals

Heat here runs nine months a year, September through May.

August is when to get a heat pump installed, before that first cold month asks something of it.

Nothing here calls for oversizing or special equipment

Half the homes here were built by 1975
88 damaging wind events from 2015 to 2024
57 hail events from 2015 to 2024

McLean County falls in climate zone 6A, built for cold winters that run long. Any split-system heat pump put in here has to hit at least 14.3 SEER2 for cooling and 7.5 HSPF2 for heating. That's a federal minimum, not something local, so it limits what a contractor can install no matter the brand or price point. The heating number matters more here than the cooling one. A system spends far more of the year keeping this house warm than cooling it, so a unit that just clears the heating minimum is worth a second look before it goes in.

Replace it before the season

Replace it before the season starts, so it happens on your schedule, not in a hurry.

Find a contractor
A gray outdoor HVAC unit mounted on a concrete pad beside a house with gray lap siding and a stone foundation.

A full winter of work, every winter

Winters here run cold. Overnight lows average 5°F across December, January and February, and that's the stretch a heat pump has to cover, month after month, not just a few cold snaps. The outdoor unit sits outside through all of it, plus whatever wind and hail the county throws at it between storms. Size it to this house and this weather, not to whatever moved the most units last season.

Ask what happens below freezing

Every heat pump loses capacity as the outdoor temperature drops. What matters is how the contractor plans for the coldest stretch. Some systems are sized to carry the house on their own. Others lean on a backup heat source once the temperature falls past a certain point. Ask where that crossover point sits and what takes over below it. A system that quietly runs on backup heat all winter is doing a different job than one built to handle the cold itself.

Ask what the ductwork has to do

A heat pump moves a different volume of air than a furnace, and at different temperatures. Ductwork built around an old gas furnace may not move enough air for the new unit to work right. Ask whether the ducts were checked against the new equipment, not assumed to be fine because they're already there. Undersized ducts show up later as a system that runs long and never quite catches up.

If there's a furnace staying in place as backup heat, it usually just stays put, since a dual fuel setup needs it. If it's coming out, someone has to disconnect the gas line and cap it off, not just unplug the unit and walk away. A gas furnace also vents outside, through a flue or a pipe in the wall, and that has to be sealed properly once it's gone. An old condenser or compressor gets disconnected from its electrical circuit and hauled off. None of this is complicated work, but it's work someone has to do, not an afterthought at the end of the job. Ask what happens to the old equipment before the new one goes in, not after.

Installation day starts outside, with the old condenser or compressor coming off its pad and the new outdoor unit going down on a fresh one, leveled so it doesn't settle crooked. Refrigerant lines get run between the outdoor unit and the indoor coil, and those lines have to be cut, brazed and checked for leaks before anything gets charged with refrigerant. The indoor side usually means a new coil set into the existing ductwork, or into an air handler if there's no furnace staying in place. Electrical work runs alongside all of it, since a heat pump needs its own dedicated circuit sized for the equipment, not whatever was feeding the old system. Once everything's connected, the contractor charges the system, checks airflow at the vents, and runs it through both heating and cooling modes before calling it done. A thermostat swap happens somewhere in there too, and it's worth asking whether the new one is compatible with how the heat pump manages backup heat.